Design, Manufacture & Installation
Apex were recently commissioned to design, manufacture and install a reel stand assembly that would interface with a new machine that our customer had just installed. The new reel stand allowed the customer to introduce a laminating layer of material into the existing web path. Pictured opposite the reel stand is fitted with two Svecom air shafts and a Nexgen web tension control unit.
To load the reels at high level Apex designed and installed a purpose built twin hoist lifting gantry system. The gantry crane bridge was fitted with a pair of tandem operated electric chain hoists connected at fixed centers with a tie bar. This method of lifting gives the operator complete control of the reel orientation even when the reel is raised out of the operator’s reaches.
For ease of use and safe operation the crane bridge travel speed was servo controlled and all crane functions are transmitted with a hand held radio controller.